Analysis and comparison of pumping concrete plug in tunnel no. 10 and no. 12 in longkou power station
รหัสดีโอไอ
Title Analysis and comparison of pumping concrete plug in tunnel no. 10 and no. 12 in longkou power station
Creator Liang Shuang
Contributor Huang Jianfeng, Ding Hongchun, Lu Jincai
Publisher Mahasarakham University
Publication Year 2561
Keyword Concrete pumping, mix design, construction technology, plug pipe, solution
Abstract The concrete of the first phase of water resources of Longkaikou hydropower station is used as the research object. The pipe diameter selection of the pump pipe, the design scheme of the mixture ratio and the prevention of plugging pipe of the pump are summarized. In this paper, different research and comparison are conducted on the proportioning design of the super-long pumping distance of the pump distance less than 800m and the length of the tunnel with no. 12 tunnel, which is longer than 800m. The matching ratio of the super-long distance pump concrete obtained by the 12 tunnel is of great reference value for similar pumping construction in the future.
Language English
คณะเทคโนโลยี มหาวิทยาลัยมหาสารคาม

บรรณานุกรม

EndNote

APA

Chicago

MLA

ดิจิตอลไฟล์

Digital File
DOI Smart-Search
สวัสดีค่ะ ยินดีให้บริการสอบถาม และสืบค้นข้อมูลตัวระบุวัตถุดิจิทัล (ดีโอไอ) สำนักการวิจัยแห่งชาติ (วช.) ค่ะ