Design & Analysis and Standard Time Study of Jig for Bus Chassis Production
รหัสดีโอไอ
Creator 1. Usawadee Ongarjwutichai
2. Somsak Siwadamrongpong
Title Design & Analysis and Standard Time Study of Jig for Bus Chassis Production
Publisher Faculty of Engineering, Khon Kaen Univeristy
Publication Year 2553
Journal Title KKU Engineering Journal
Journal Vol. 37
Journal No. 4
Page no. 319-328
Keyword Bus, Chassis,Standard time, Jig and Fixture
ISSN 0125-8273
Abstract Recently, bus manufacturing is majority built on used chassis. The used chassis will be maintenance before assembly. The minority is built on own design chassis. However, the chassis manufacturing processes is quite very long throughputs, which lead to low production rate. This study aims to reduce chassis platform production time by designing of production jigs. Chassis technical data and information was collected in Cherdchai Industrial. The strength analysis by simulation with ANSYS workbench. It was found that the weakest point has SF 1.60. Moreover, the lock pin also need for changing of materials. Standard time for production of each sub-assembly was calculated. It was found that production rate of 2.3 chassis/day is achieved based on 2 workers. The 2 workers yield about 90% increasing in production rate compared to 1worker and %idle less than that of 4 workers. 6 workers with additional 2 jigs yields production rate of 5 chassis/day. The additional 2 workers yield about 25% increasing in production rate compared to 4 workers system.
KKU Engineering Journal

บรรณานุกรม

EndNote

APA

Chicago

MLA

ดิจิตอลไฟล์

Digital File
DOI Smart-Search
สวัสดีค่ะ ยินดีให้บริการสอบถาม และสืบค้นข้อมูลตัวระบุวัตถุดิจิทัล (ดีโอไอ) สำนักการวิจัยแห่งชาติ (วช.) ค่ะ