|
Examining the impacts of individual lot stormwater detention in a housing estate |
|---|---|
| รหัสดีโอไอ | |
| Creator | Darrien Y.S. Mah |
| Title | Examining the impacts of individual lot stormwater detention in a housing estate |
| Contributor | Johnny O. K. Ngu, P. D. Caroline, M. A. Malek |
| Publisher | Asia-Pacific Journal of Science and Technology |
| Publication Year | 2565 |
| Journal Title | Asia-Pacific Journal of Science and Technology |
| Journal Vol. | 27 |
| Journal No. | 1 |
| Page no. | 10-Jan |
| Keyword | Car porch, Drainage, Mekarsari, Modular, Sustainable development, Urban runoff |
| URL Website | https://www.tci-thaijo.org/index.php/APST |
| Website title | https://so01.tci-thaijo.org/index.php/APST/article/view/244476 |
| ISSN | 2539-6293 |
| Abstract | This paper describes the Storm Water Management Model (SWMM) simulations of three individual lot stormwater detention systems under the car porches of houses. These three systems consist of ready-made modular units presumably fitted under 49 m2 car porches of 204 double-story terrace houses. The 37,032 m2 housing estate is calculated to have 75% of land covered with houses, 25% with roads and other infrastructures. The housing estate was subjected to 5-minute, 10-year Average Recurrent Interval (ARI) short-duration design rainfall. The model predicted that all three systems could reduce the peak runoff at outfall from 2.79 to 0.38 m3/s. It indicated that any of the system could cause 86% reduction of the runoff for the whole housing estate. In order to differentiate the performance of the three systems, the housing lot was further investigated. When Type 1 system (1.15 m high with 49 m3 per lot) was analysed by the SWMM model, only 8% of its storage volume was filled that highlights an over design. Type 2 system (0.3 m high with 6 m3 per lot) modelled at 84% while Type 3 system (0.3 m high with 9 m3 per lot), at 54%. The difference in heights between the systems explained the low percentage of filling for the Type 1 system. Comparing Type 2 and Type 3, concrete structure within Type 3 had only half of its volume filled. In this light, the Type 2 system made of polyethylene pieces was found the most efficient in lowering post-development peak runoff. |