Productivity improvementfor heating ventilation and air conditioning unit assembly |
---|---|
รหัสดีโอไอ | |
Creator | 1. Vichai Rungreunganun 2. Teansin Sriwasut |
Title | Productivity improvementfor heating ventilation and air conditioning unit assembly |
Publisher | Research and Development Office, Prince of Songkla University |
Publication Year | 2561 |
Journal Title | Songklanakarin Journal of Science and Technology |
Journal Vol. | 40 |
Journal No. | 1 |
Page no. | 219 |
Keyword | productivity improvement, standard time, motion economy, ECRS |
URL Website | http://rdo.psu.ac.th/sjstweb/index.php |
ISSN | 0125-3395 |
Abstract | The objective of this research was to improve the productivity for the air conditioner unit of for car manufacturers.The target production volume of the air conditioner unit was greater than 46 pieces per hour. The current capacity wasinsufficient, so the researchers studied the problems using a study of the assembly standard time. The study found the assemblyline bottleneck standard time was 1.64 minutes per piece, representing a yield of 36 pieces per hour. The labor productivity was1.84 pieces per person per hour. The operation two-hand chart and operation area check sheet analysis was applied to find theoperations that should be improved because the standard time was over the takt time. After that the Eliminate, Combine,Rearrange, Simplify (ECRS) technique was used to propose a method for process improvement. After improvement, thebottleneck was 1.28 minutes per piece which represented a yield of 46.9 pieces per hour. The labor production rate wasequivalent to 2.35 pieces per hour or an increase of 27.1%. |