<?xml version="1.0" encoding="UTF-8"?>
<xml><bibliography><APA>Kuo Chieh Chao และผู้แต่งคนอื่นๆ. (2026) Overbreak Reduction by Optimized Drilling and Blasting Parameters: Lessons from the High-Speed Railway Project in Thailand. &lt;i&gt;The Geotechnical Engineering Journal of the SEAGS &amp; AGSSEA&lt;/i&gt;, &lt;i&gt;57&lt;/i&gt;(2), 7-16.</APA><Chicago>Kuo Chieh Chao และผู้แต่งคนอื่นๆ. "Overbreak Reduction by Optimized Drilling and Blasting Parameters: Lessons from the High-Speed Railway Project in Thailand". The Geotechnical Engineering Journal of the SEAGS &amp; AGSSEA  57 (2026):7-16.</Chicago><MLA>Kuo Chieh Chao และผู้แต่งคนอื่นๆ. Overbreak Reduction by Optimized Drilling and Blasting Parameters: Lessons from the High-Speed Railway Project in Thailand. Southeast Asian Geotechnical Society:ม.ป.ท. 2026.</MLA></bibliography></xml>
